Ruskin Dam
Client: BC Hydro
Location: Ruskin, BC
Value: $3,263,465
Completion: December 2017
Project Synopsis:
- Remove one fire door in the lower air gallery;
- Build one new fire door in the lower air gallery;
- Cut one opening in slab on mezzanine above upper air gallery;
- Cut one opening in the slab on the upper air gallery;
- Remove six existing louvers in the upper air gallery;
- Remove all existing fire doors isolating the Turbine pit from the lower air gallery;
- Remove all existing fire doors (louvers) and metal plates isolating the generator enclosure from the upper air gallery;
- Close the two existing openings in the upper air gallery;
- New holes for fire protection in the upper air gallery;
- Install new steel structure and grating as per drawing in reference in Appendix G;
- Install new handrails in the lower air gallery.