Bear Flat Bridge
Client: BC Ministry of Transportation and Infrastructure
Location: Fort St John, BC
Value: $79,200,000
Anticipated Completion: 2023
Project Synopsis:
- Construction of a 2-lane, 600 meter long, steel girder bridge with cast-in-place concrete abutments, piers, and deck.
- Construction of 8 km of 2-lane highway.
- Construction and removal of temporary detour road and bridge.
- Construction and removal of temporary access road and bridge.